3aa3 ES PROJECTS » Brewhouse
Eschenlohr Projects

Brewhouse

Brewhouse 2,7 hl

Brewhouse with a cast wort of 2,7 hl in good condition. The brew vessel are made on stainless steel some with copper cladding.
Detail Information

Brewhouse 40 hl

Brewhouse with a cast wort of 40 hl, constructed in 1997, in a very good condition. The brewhouse is mounted on a stainless steel frame and fully automated by a Siemens control. The brewhouse was shut down in 2011.
Detail Information

Brewhouse 55 hl

Brewhouse with malt treatment in a good condition. The installation is entirely constructed in 1992 and was operated manually. Automation is retrofittable. The wort copper is made of copper.
Detail Information

Brewhouse 660 hl

Brewhouse with a cast wort of 660 hl. 16 brews per day are possible.
Detail Information

870 hl 1988

Brewhouse with 2 identical brew streams in a very good condition. The brewhouse was predominant constructed in 1988 and well maintained. The control unit from Alan Bradley is dismantled; control plans are available. All components of the brewhouse are also singularly available.
Detail Information

Mash filter 4,9 t

Mash filter with a loading for max. 4.934 kg malt in a good condition. In 1993 the filter plates have been refurbished and replaced by Meura plates. The filter will be sold together with a hammer mill. The mash filter has been dismantled in 2011.
Detail Information

Malt Mill, 500 kg ph

Malt mill with a capacity up to 500 kg ph in a good condition. The mill comes from a brew house with 20 hl cast wort.
Detail Information

Malt Mill– Maischomat, 7,5 tph

Maischomat in a good condition for wet grinding of brewing malt. The maischomat was dismantled from a brew house with a cast wort of 165 hl.
Detail Information

Malt Treatment 10 tph

Malt treatment with a capacity of 10 tph each in a very good condition. The installation is available in parts and in single machines. Both streams are shut down.
Detail Information
295

© 2007 ES PROJECTS GmbH. All rights reserved. Last update: 20.02.2013

0